Pawar & Sons

Pipeline laying MS, DI & HDPE pipeline contractors, back-to-back basis

We lay MS, DI and HDPE pipelines for EPC contractors as your subcontractor on back-to-back terms. Trenching, lowering, jointing, testing, jack pushing crossings and CC road restoration, by one crew.

One crew for the whole line. Trench, crossing and road.

Pipeline packages lose time at every handover: one gang for the trench, another contractor for the road crossing, someone else for the road restoration. We take the whole stretch, from road cutting and trenching through laying, jointing, testing and jack pushing under crossings, to relaying the CC road.

We work on a back-to-back basis. Our subcontract mirrors your main contract, with the same drawings, specifications, quality checks, milestones and payment terms, so your client’s requirements become ours and you deal with one accountable team.

Pipes we lay

Three pipe materials, each with its own jointing method.

PipeTypical useJointing
MS (mild steel)Water transmission mains, large diameters, casingsWelded joints, with joint coating and lining repair
DI (ductile iron)Water distribution and sewer rising mainsPush-on socket and spigot or mechanical joints
HDPEWater lines, sewer lines, cable and utility ductsButt fusion or electrofusion welding

What we handle

Road cutting & trenching

Cutting the road, excavating the trench to line and level, with shoring and dewatering where needed.

Bedding & lowering

Preparing the bed and lowering pipes by crane or by hand, depending on size.

Jointing

Welding MS joints, push-on DI joints, and butt or electrofusion of HDPE.

Crossings

Road, highway and railway crossings by jack pushing, so the main line isn’t held up.

Testing & backfill

Hydrostatic testing of sections, then backfilling and compaction in layers.

CC road restoration

Relaying the concrete road over the trench, cured and ready to hand back.

How a pipeline stretch runs

  1. Survey & marking

    We walk the route, mark the alignment and locate existing cables and pipes before any digging.

  2. Cutting & trenching

    The road is cut and the trench excavated to depth, shored and dewatered where needed.

  3. Bedding & lowering

    The bed is prepared and pipes are lowered and aligned in the trench.

  4. Jointing

    Joints are welded, pushed or fused according to the pipe material and specification.

  5. Testing & backfill

    Sections are pressure tested, then backfilled and compacted.

  6. Road restoration

    The CC road is relaid and cured, and the stretch is handed back.

Working back to back

For EPC contractors who want to sublet a pipeline package without losing control of quality or schedule.

Pipeline clients

  • MEIL: MS pipeline laying
  • L&T: pipelines & CC road restoration
  • Ramky: jack pushing
  • Same drawings and specifications as your main contract
  • Your client’s QA/QC, inspections and test formats
  • Schedule aligned to your milestones
  • Billing on your measurement and payment cycle
  • Our own crews and tools, with cranes arranged as needed
  • Helmets, harnesses and site safety rules on every stretch
  • Crossings by our own jack pushing crew
  • CC road restoration included in the package

Pipeline questions

What does working on a back-to-back basis mean?

Our subcontract mirrors your main contract: the same drawings, specifications, quality checks, schedule and payment terms that your client has set. You pass the package to us on those terms, and we deliver it to your client’s standard.

Which pipe sizes do you lay?

We lay MS, DI and HDPE pipelines across a wide range of diameters, from distribution lines to large-diameter MS transmission mains. Send us the pipe size, length and route and we’ll confirm the method.

Do you restore the road after laying the pipeline?

Yes. CC road restoration is part of our scope: once the trench is backfilled and compacted, we relay the concrete road so the stretch can be handed back to the authority.

Can you handle road and railway crossings on the same line?

Yes. Where the line has to cross a road, highway or railway, our jack pushing crew takes it underneath by manual pipe jacking, so you don’t need a separate crossing contractor.

Pipeline package to sublet?

Send the pipe material, size, length and route, plus your main contract specifications. We’ll review them and send back-to-back rates and a schedule.